{"id":13025,"date":"2019-10-25T22:42:35","date_gmt":"2019-10-25T20:42:35","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/vom-hoenggerberg-zum-wolkenwerk-eth-studierende-zu-gast\/"},"modified":"2020-01-30T07:23:49","modified_gmt":"2020-01-30T06:23:49","slug":"vom-hoenggerberg-zum-wolkenwerk-eth-studierende-zu-gast","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/vom-hoenggerberg-zum-wolkenwerk-eth-studierende-zu-gast\/","title":{"rendered":"From H\u00f6nggerberg to WolkenWerk"},"content":{"rendered":"<p>Since summer of 2017, L\u00fcchinger+Meyer has been realizing the <a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/wolkenwerk-zuerich\/\">WolkenWerk<\/a> in the north of Zurich in collaboration with <a href=\"https:\/\/staufer-hasler.ch\/\">Staufer &amp; Hasler Architekten<\/a> and <a href=\"https:\/\/www.vonballmoospartner.ch\/\">von Ballmos Partner Architekten<\/a>. Meanwhile, the three residential towers Werk B, C, D are built up and the structural work of the first construction phase is near completion.<br \/>\nWe gladly agreed on request from the <a href=\"https:\/\/ethz.ch\/en.html\">ETH Zurich<\/a> to present the project on site to students attending the <a href=\"https:\/\/concrete.ethz.ch\/sbe-i\/\">Reinforced Concrete I<\/a> lecture teached by <a href=\"https:\/\/kaufmann.ibk.ethz.ch\/personen\/professor.html\">Prof. Dr. Walter Kaufmann<\/a>. About 80 young engineers arrived at the impressive construction site on the 24<sup>th<\/sup> of October.<br \/>\nAndreas Gianoli, who was acting as project leader, begun with some preliminary remarks. Followed by a presentation in particular about the technically interesting aspects, Bla\u017eenka Mato\u0161evi\u0107 and Christoph Pfammatter, who were instrumental in the realization of the project, addressed their words to the audience. The focus was mainly on intercepting structures such as the pre-stressed wall panels on the first floor or the pre-stressed beams in the basement as well as the element construction from prefabricated concrete elements.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since summer of 2017, L\u00fcchinger+Meyer has been realizing the WolkenWerk in the north of Zurich in collaboration with Staufer &amp; Hasler Architekten and von Ballmos Partner Architekten. Meanwhile, the three residential towers Werk B, C, D are built up and the structural work of the first construction phase is near completion. We gladly agreed on [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":12512,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-13025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/13025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=13025"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/13025\/revisions"}],"predecessor-version":[{"id":13027,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/13025\/revisions\/13027"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/12512"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=13025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=13025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=13025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}