{"id":14519,"date":"2020-04-18T16:19:20","date_gmt":"2020-04-18T14:19:20","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/sport-frei-egnach\/"},"modified":"2020-05-01T08:33:49","modified_gmt":"2020-05-01T06:33:49","slug":"sport-frei-egnach","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/sport-frei-egnach\/","title":{"rendered":"A gift for the athletes of Egnach"},"content":{"rendered":"<p>&#8220;One must celebrate festivals as they fall.&#8221; And sometimes also when they are cancelled&#8230; we make today our motto and celebrate in silence, but with joy and pride the inauguration of the new <a href=\"https:\/\/www.luechingermeyer.ch\/project\/dreifachturnhalle-neukirch-egnach\/\">triple use sports hall Neukirch<\/a> in Egnach. Together with <a href=\"https:\/\/www.wdarchitekten.ch\/\">Waeber \/ Dickenmann Architekten<\/a>, the structural engineers of L\u00fcchinger+Meyer got involved in the project planning and realization of the building, which was erected in the immediate vicinity of the newly built <a href=\"https:\/\/www.luechingermeyer.ch\/project\/sekundarschule-neukirch-egnach\/\">secondary school<\/a>, which had previously been built in the same planning cooperation.<br \/>\nAlready one year ago, in May 2019, the completed sports facility was handed over to the clubs of the municipality of Egnach. After the final adaptation of the outdoor sports field, the sports hall was to be inaugurated today, Saturday, during a large public festival. Of course, this event could not take place because of to the current viral danger situation and was responsibly cancelled. Nevertheless, we will not let the festive atmosphere be taken away from us.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;One must celebrate festivals as they fall.&#8221; And sometimes also when they are cancelled&#8230; we make today our motto and celebrate in silence, but with joy and pride the inauguration of the new triple use sports hall Neukirch in Egnach. Together with Waeber \/ Dickenmann Architekten, the structural engineers of L\u00fcchinger+Meyer got involved in the [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":14380,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-14519","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/14519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=14519"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/14519\/revisions"}],"predecessor-version":[{"id":14521,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/14519\/revisions\/14521"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/14380"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=14519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=14519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=14519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}