{"id":17663,"date":"2021-01-19T23:20:23","date_gmt":"2021-01-19T22:20:23","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/musee-atelier-im-detail\/"},"modified":"2021-01-21T14:34:04","modified_gmt":"2021-01-21T13:34:04","slug":"musee-atelier-im-detail","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/musee-atelier-im-detail\/","title":{"rendered":"Mus\u00e9e Atelier in DETAIL"},"content":{"rendered":"<p>Rarely has one of our projects received so much press coverage as the <a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/museum-audemars-piguet-apc-le-brassus\/\">Mus\u00e9e Atelier Audemars Piguet<\/a>. Numerous articles and documentations in daily newspapers and professional journals, in architecture journals and design blogs focused on the new museum building of the watch manufacturer that opened last year. Some articles were competently dedicated to the engineering services that were essential to the realisation of the complex glass building. Of course, we did not miss the opportunity to report first-hand on the constructional challenges and concepts, the engineering pitfalls and solutions that characterised our involvement with the project during the six-year period of work. We were given the opportunity to do this by the renowned professional journal <a href=\"https:\/\/www.detail.de\/\">DETAIL<\/a>, which is distributed to readers in more than 80 countries with a total circulation of more than 20,000 copies. In its technology section, DETAIL regularly gives expert engineers a chance to have their say.<br \/>\nUnder the title &#8220;An Emblematic Double Spiral&#8221;, the authors Philippe Willareth, Matthias Kunze and Josua Villiger give a comprehensive and detailed insight into the technical complexity and the constructive details behind or in the glass fa\u00e7ades.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rarely has one of our projects received so much press coverage as the Mus\u00e9e Atelier Audemars Piguet. Numerous articles and documentations in daily newspapers and professional journals, in architecture journals and design blogs focused on the new museum building of the watch manufacturer that opened last year. Some articles were competently dedicated to the engineering [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":17652,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-17663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/17663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=17663"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/17663\/revisions"}],"predecessor-version":[{"id":17665,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/17663\/revisions\/17665"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/17652"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=17663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=17663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=17663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}