{"id":26364,"date":"2023-02-04T16:22:10","date_gmt":"2023-02-04T15:22:10","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/ein-co2-neutrales-hochhaus-am-letzigrund\/"},"modified":"2023-04-21T13:57:06","modified_gmt":"2023-04-21T11:57:06","slug":"ein-co2-neutrales-hochhaus-am-letzigrund","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/ein-co2-neutrales-hochhaus-am-letzigrund\/","title":{"rendered":"A CO2-neutral high-rise building at Letzigrund"},"content":{"rendered":"<p>A slender residential tower at Badenerstrasse 501-505 in Zurich will complete the architectural ensemble at Letzigrund stadium from 2027 onwards. The <a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/neubau-badenerstrasse-501-505-zuerich\/\">design proposal<\/a> by <a href=\"https:\/\/www.meierhug.ch\/\">Michael Meier and Marius Hug Architects<\/a> has been the winning architectural study, commissioned by owner and project developer <a href=\"https:\/\/allreal.ch\/en\/\">Allreal Generalunternehmung<\/a>. L\u00fcchinger+Meyer assisted the design team as fa\u00e7ade engineers. The high-rise will offer 64 flats and commercial space on the ground floor, with a shared terrace on the building&#8217;s roof top. The red colour of the new building will corresponds with the neighbouring stadium.<br \/>\nAn important objective of the competition programme was the sustainability aspects. An underground car park was deliberately omitted, as the high-rise residential building is centrally located and ideally connected to public transport. The new building also meets the requirement for completely CO2-neutral operation, which is achieved due to the extensive use of the fa\u00e7ades for energy generation by means of photovoltaics. The jury explicitly acknowledges the careful planning of the building envelope: &#8220;The design implementation of the fa\u00e7ade and volume is convincing and meets the increased requirements for a high-rise building. [&#8230;] The differentiated response of the fa\u00e7ade, which is covered with PV modules depending on the orientation, does meet to the very different conditions in all directions and at the same time manages to visually hold the large building volume together.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A slender residential tower at Badenerstrasse 501-505 in Zurich will complete the architectural ensemble at Letzigrund stadium from 2027 onwards. The design proposal by Michael Meier and Marius Hug Architects has been the winning architectural study, commissioned by owner and project developer Allreal Generalunternehmung. L\u00fcchinger+Meyer assisted the design team as fa\u00e7ade engineers. The high-rise will [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":25197,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-26364","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/26364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=26364"}],"version-history":[{"count":3,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/26364\/revisions"}],"predecessor-version":[{"id":26367,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/26364\/revisions\/26367"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/25197"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=26364"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=26364"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=26364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}