{"id":27382,"date":"2023-06-16T15:22:57","date_gmt":"2023-06-16T13:22:57","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/gewinner-building-award-2023\/"},"modified":"2023-06-19T14:34:56","modified_gmt":"2023-06-19T12:34:56","slug":"gewinner-building-award-2023","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/gewinner-building-award-2023\/","title":{"rendered":"Winning the Building Award 2023"},"content":{"rendered":"<p>The joy is enormous! Our project for the <a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/umnutzung-felix-platter-spital-basel-2\/\">conversion of the Felix Platter Hospital<\/a> in Basel has won the <a href=\"https:\/\/www.building-award.ch\/\">Building Award<\/a> 2023, Switzerland&#8217;s most prestigious engineering prize. With visible pride, our project manager Andreas Gianoli and technical designer Manuel Gomez accepted the award yesterday evening in the KKL Luzern and answered the questions of moderator Christa Rigozzi. They represent the intense exchange of engineering and constructive experience that was essential for the realization of this challenging preservation project.<br \/>\nIn her laudatory speech, jury member Judit Solt praised the winning project in the structural engineering category as follows: &#8220;Transforming instead of replacing, upgrading instead of destroying, building culture instead of disposable construction &#8211; the conversion of the Felix Platter Hospital from the 1960s into a cooperative residential building is a brilliant example of how this can succeed.&#8221;<br \/>\nAt the same time, the juror praised the client&#8217;s courage in preserving the existing building and emphasized the challenging interdisciplinary cooperation as an essential foundation of the project&#8217;s success. A constructive cooperation of all actors as the key to the realization of the &#8220;Miteinanderhaus&#8221;. We are very happy to share the award and the joy with our project partners: <a href=\"https:\/\/www.wohnen-mehr.ch\/\">Baugenossenschaft wohnen &amp; mehr<\/a>, <a href=\"https:\/\/www.muellersigrist.ch\/\">M\u00fcller Sigrist Architekten<\/a>, <a href=\"https:\/\/www.rapp.ch\/en\">Rapp AG<\/a>, <a href=\"https:\/\/www.lorenzeugster.ch\/\">Lorenz Eugster<\/a>, <a href=\"https:\/\/www.studiodurable.ch\/\">durable<\/a>, <a href=\"http:\/\/www.aebo.ch\/\">Aegerter &amp; Bosshardt<\/a>, <a href=\"https:\/\/www.boess.ch\/de\/elektro-ingenieure\">Boess Gruppe<\/a>, <a href=\"https:\/\/heivi.ch\/\">HeiVi AG<\/a>, <a href=\"https:\/\/www.nm-ag.ch\/\">NM Fassadentechnik<\/a>, <a href=\"https:\/\/implenia.com\/en\/?year=2010&amp;cHash=909f54105777f695ecb9d378ee196ccd\">Implenia Modernisation<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The joy is enormous! Our project for the conversion of the Felix Platter Hospital in Basel has won the Building Award 2023, Switzerland&#8217;s most prestigious engineering prize. With visible pride, our project manager Andreas Gianoli and technical designer Manuel Gomez accepted the award yesterday evening in the KKL Luzern and answered the questions of moderator [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":27354,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-27382","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/27382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=27382"}],"version-history":[{"count":4,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/27382\/revisions"}],"predecessor-version":[{"id":27389,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/27382\/revisions\/27389"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/27354"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=27382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=27382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=27382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}