{"id":29721,"date":"2023-09-29T16:30:06","date_gmt":"2023-09-29T14:30:06","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/aller-guten-dinge-sind-drei\/"},"modified":"2023-10-11T11:28:07","modified_gmt":"2023-10-11T09:28:07","slug":"aller-guten-dinge-sind-drei","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/aller-guten-dinge-sind-drei\/","title":{"rendered":"All good things come in threes"},"content":{"rendered":"<p>With the completion of the 130 m long <a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/pergola-hilti-campus-schaan-fl\/\">pergola<\/a>, we set the final stone of our three-part work at the Hilti Campus in Schaan. This was preceded by our structural design services for the new \u2018<a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/hilti-office-mittenord-schaan-fl\/\">Office Mitte<\/a>\u2019 and \u2018<a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/hilti-office-nord-schaan-fl\/\">Office Nord<\/a>\u2019 buildings, which we had the privilege of realizing for the <a href=\"https:\/\/www.hilti.group\/content\/hilti\/CP\/XX\/en.html\">Hilti Group<\/a> together with <a href=\"https:\/\/www.giulianihoenger.ch\/en\">Giuliani H\u00f6nger Architekten<\/a>. The modern working environments of the office buildings are now complemented by the generous open space element. It not only serves as a protected passage between the parking garage and the \u2018Office Nord\u2019, but also offers outdoor working opportunities for informal exchanges, meetings and team events.<br \/>\nThe design by <a href=\"https:\/\/www.vogt-la.com\/\">Vogt Landschaftsarchitekten<\/a> includes 315 circular skylights &#8211; in various sizes and with differently colored glass frames &#8211; that break up the bottom view of the concrete roof and generate original light and reflection effects. The insert geometry was parameterized using a numerical optimization algorithm in such a way that, despite the variable roof pitch and the conical insert geometry, only 4 different insert types had to be created per opening diameter.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the completion of the 130 m long pergola, we set the final stone of our three-part work at the Hilti Campus in Schaan. This was preceded by our structural design services for the new \u2018Office Mitte\u2019 and \u2018Office Nord\u2019 buildings, which we had the privilege of realizing for the Hilti Group together with Giuliani [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":29489,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-29721","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/29721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=29721"}],"version-history":[{"count":3,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/29721\/revisions"}],"predecessor-version":[{"id":29727,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/29721\/revisions\/29727"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/29489"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=29721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=29721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=29721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}