{"id":30453,"date":"2023-11-02T19:26:34","date_gmt":"2023-11-02T18:26:34","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/pleine-lune-pangolin\/"},"modified":"2023-12-06T10:04:01","modified_gmt":"2023-12-06T09:04:01","slug":"pleine-lune-pangolin","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/pleine-lune-pangolin\/","title":{"rendered":"Pleine Lune &#038; Pangolin"},"content":{"rendered":"<p>The new Telli secondary school centre, which is to be built next to the athletics facility of the same name, will provide spacious new school and sports facilities for the city of Aarau. The structural engineers from L\u00fcchinger+Meyer won 2nd and 3rd place in the competition for the new building. Timber-concrete hybrid constructions were used in both projects.<br \/>\nThe second-ranked design &#8220;<a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/oberstufenzentrum-telli-aarau\/\">Pleine Lune<\/a>&#8220;, developed with <a href=\"https:\/\/blaettlerdafflon.ch\/\">Bl\u00e4ttler Dafflon Architekten<\/a> and <a href=\"https:\/\/kunzarchitekten.ch\/projekte\">kunzarchitekten<\/a>, provides two compact new building volumes to complement the existing indoor swimming pool. The structural concept of the four-storey school building is based on a strict floor plan that allows for appropriate flexibility of use. The single-axis floor slabs spanning over 5.00 m are designed as timber-concrete composite structures with glulam ribs that act as a bond with the topping of recycled concrete. These ceilings are supported by slender prefabricated, partially prestressed concrete main beams resting on timber columns. A similar load-bearing system is used for the sports building, where the almost 2 metre high prefabricated, prestressed concrete beams span the triple gymnasium in a transverse direction.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new Telli secondary school centre, which is to be built next to the athletics facility of the same name, will provide spacious new school and sports facilities for the city of Aarau. The structural engineers from L\u00fcchinger+Meyer won 2nd and 3rd place in the competition for the new building. Timber-concrete hybrid constructions were used [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":29907,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-30453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/30453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=30453"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/30453\/revisions"}],"predecessor-version":[{"id":30455,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/30453\/revisions\/30455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/29907"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=30453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=30453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=30453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}