{"id":31225,"date":"2024-01-24T15:37:20","date_gmt":"2024-01-24T14:37:20","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/spatenstich-in-doppelschicht\/"},"modified":"2024-01-29T08:58:12","modified_gmt":"2024-01-29T07:58:12","slug":"spatenstich-in-doppelschicht","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/spatenstich-in-doppelschicht\/","title":{"rendered":"Ground-breaking ceremony in double shift"},"content":{"rendered":"<p>It\u2019s the launch for Basel&#8217;s generational project. Representatives of the canton, the client and the planning team sent out a strong joint signal on Monday afternoon at the official ground-breaking ceremony for the new <a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/neubau-klinikum-2-universitaetsspital-basel\/\">Klinikum 2 at Basel University Hospital<\/a>. In a double constellation, various players picked up their tools to support the start of the construction work symbolically. Including the Director of Health of the Canton of Basel-Stadt, Dr. Lukas Engelberger, Chairman of the USB Board Directors Robert-Jan Bumbacher and Hospital Director Dr. med. Werner K\u00fcbler. The GP team was represented by general manager Tossan Souchon (<a href=\"https:\/\/www.archipel-gp.ch\/\">Archipel<\/a>) and architect Lorenzo Giuliani. Many guests attended the start of the first construction phase, underlining the broad public interest in the project. The structural engineers from L\u00fcchinger+Meyer were of course also present on the Basel construction site, who have been alongside <a href=\"https:\/\/www.giulianihoenger.ch\/en\">Giuliani H\u00f6nger Architekten<\/a> since the <a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/erneuerung-klinikum-2-universitaetsspital-basel\/\">competition success<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It\u2019s the launch for Basel&#8217;s generational project. Representatives of the canton, the client and the planning team sent out a strong joint signal on Monday afternoon at the official ground-breaking ceremony for the new Klinikum 2 at Basel University Hospital. In a double constellation, various players picked up their tools to support the start of [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":31105,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-31225","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/31225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=31225"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/31225\/revisions"}],"predecessor-version":[{"id":31227,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/31225\/revisions\/31227"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/31105"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=31225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=31225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=31225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}