{"id":36230,"date":"2024-11-21T13:08:47","date_gmt":"2024-11-21T12:08:47","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/zamfir\/"},"modified":"2024-11-28T09:08:25","modified_gmt":"2024-11-28T08:08:25","slug":"zamfir","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/zamfir\/","title":{"rendered":"Zamfir"},"content":{"rendered":"<p>On the &#8220;Campus Meielen Nord&#8221; in Zollikofen, a suburb of Bern, an additional archive building for the <a href=\"https:\/\/www.bar.admin.ch\/bar\/en\/home.html\">Swiss Federal Archives<\/a> is set to be constructed. In the competition held for this purpose, characterized by an extraordinary diversity of design concepts, our structural and fa\u00e7ade planners, in collaboration with <a href=\"https:\/\/www.danielhaessig.ch\/\">Daniel H\u00e4ssig Architekten<\/a>, achieved 3rd place.<br \/>\nThe project was named after Gheorghe Zamfir, a world-famous Romanian pan flutist, whose instrument inspired the building&#8217;s design. The proposal envisions three simple structures: a distinctive stair tower, an elongated operations building centre with a rooftop garden, and a high-bay warehouse designed in a stepped, pan flute-like arrangement. The jury report recognizes the high conceptual and architectural quality of the &#8220;<a href=\"https:\/\/www.luechingermeyer.ch\/en\/project\/neubau-magazin-bundearchiv-zollikofen\/\">Zamfir<\/a>&#8221; project proposal. We are particularly pleased with the special praise for the fa\u00e7ade design: &#8220;The detailed fa\u00e7ade design skillfully references the industrial-commercial past of the site in a very appealing and accessible way, which is highly appreciated.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On the &#8220;Campus Meielen Nord&#8221; in Zollikofen, a suburb of Bern, an additional archive building for the Swiss Federal Archives is set to be constructed. In the competition held for this purpose, characterized by an extraordinary diversity of design concepts, our structural and fa\u00e7ade planners, in collaboration with Daniel H\u00e4ssig Architekten, achieved 3rd place. The [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":36097,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-36230","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/36230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=36230"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/36230\/revisions"}],"predecessor-version":[{"id":36232,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/36230\/revisions\/36232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/36097"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=36230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=36230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=36230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}