{"id":50454,"date":"2026-07-04T18:32:25","date_gmt":"2026-07-04T16:32:25","guid":{"rendered":"https:\/\/lmp-ing.ch\/mitten-im-park-aqua\/"},"modified":"2026-07-07T15:33:59","modified_gmt":"2026-07-07T13:33:59","slug":"mitten-im-park-aqua","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/mitten-im-park-aqua\/","title":{"rendered":"In the Middle of the Park &#038; AQUA"},"content":{"rendered":"<p>Designing halls usually makes structural engineers\u2019 hearts beat faster. All the greater was the excitement at L\u00dcCHINGER MEYER PARTNER when the company had the opportunity to support two teams in the final round of the competition for the new KSS indoor swimming pool in Schaffhausen, ultimately securing second and third place. In the Breite district, close to the city centre, the existing indoor swimming pool is to be replaced by a new building. Together with the existing outdoor pool and ice sports facilities, the project offers the opportunity to create an integrated sports and leisure centre with wellness facilities for the region.<\/p>\n<p><strong><em>Mitten im Park<\/em>! \u00a0(In the Middle of the Park!)<\/strong>\u00a0\u2013 the title says it all for the second-placed <a href=\"https:\/\/lmp-ing.ch\/en\/project\/neubau-hallenbad-kss-schaffhausen-2\/\">project<\/a> by <a href=\"https:\/\/www.bkar.ch\/\">Berrel Kr\u00e4utler Architekten<\/a>. To create one large, continuous lawn area for the outdoor pool, the new combined facility for gastronomy, water sports and ice sports will be attached directly to the existing IWC Arena. The structural concept is based on hybrid timber-concrete construction. The technical basement and the ground floor with the pools are planned in cast-in-place concrete, while the upper storeys are of timber construction. Areas with large spans are supported by two-storey trusses made of laminated beech veneer lumber. The swimming hall roof consists of glulam beams, with timber box elements spanning between them.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Designing halls usually makes structural engineers\u2019 hearts beat faster. All the greater was the excitement at L\u00dcCHINGER MEYER PARTNER when the company had the opportunity to support two teams in the final round of the competition for the new KSS indoor swimming pool in Schaffhausen, ultimately securing second and third place. In the Breite district, [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":50204,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-50454","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/50454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=50454"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/50454\/revisions"}],"predecessor-version":[{"id":50456,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/50454\/revisions\/50456"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/50204"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=50454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=50454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=50454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}