{"id":55653,"date":"2026-11-27T22:07:12","date_gmt":"2026-11-27T21:07:12","guid":{"rendered":"https:\/\/lmp-ing.ch\/totoro-a-commitment-to-timber-construction\/"},"modified":"2026-11-27T22:21:43","modified_gmt":"2026-11-27T21:21:43","slug":"totoro-a-commitment-to-timber-construction","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/en\/totoro-a-commitment-to-timber-construction\/","title":{"rendered":"Totoro \u2013 A Commitment to Timber Construction"},"content":{"rendered":"<p>The appeal of the municipality of Aesch, located south of the Basel metropolitan region, has led to a rise in the number of school-age children and consequently to a growing need for school space. A new primary school is therefore to be developed at the Sch\u00fctzenmatt site. The design <a href=\"https:\/\/lmp-ing.ch\/en\/project\/new-primary-school-building-aesch\/\">Totoro<\/a> by the team led by Weyell Zipse Architekten emerged as the winner of the study commission. The spatial programme is distributed across two buildings: an elongated, two-storey volume along the \u201cwild hedge\u201d housing all school functions, and the double sports hall as an extension of the existing campus.<br \/>\n\u201cThe project has been developed with impressive architectural inspiration, subtly and at the same time with a confident command of its content. &#8230; The architectural expression arouses curiosity, the spatial organisation is convincing and the constructional detailing is impressive. On the basis of these fine qualities, the project will become a valuable, distinctive part of the school campus and a reliable friend to generations of pupils and teachers.\u201d The structural and fa\u00e7ade engineers of L\u00dcCHINGER MEYER PARTNER involved in the project are also delighted by the jury\u2019s appreciative summary.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The appeal of the municipality of Aesch, located south of the Basel metropolitan region, has led to a rise in the number of school-age children and consequently to a growing need for school space. A new primary school is therefore to be developed at the Sch\u00fctzenmatt site. The design Totoro by the team led by [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":55614,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-55653","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/55653","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/comments?post=55653"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/55653\/revisions"}],"predecessor-version":[{"id":55658,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/posts\/55653\/revisions\/55658"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media\/55614"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/media?parent=55653"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/categories?post=55653"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/en\/wp-json\/wp\/v2\/tags?post=55653"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}