{"id":13918,"date":"2020-03-13T11:55:09","date_gmt":"2020-03-13T10:55:09","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/uhfb-premiere-in-zuerich\/"},"modified":"2020-03-20T20:57:48","modified_gmt":"2020-03-20T19:57:48","slug":"uhfb-premiere-in-zuerich","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/fr\/uhfb-premiere-in-zuerich\/","title":{"rendered":"Une premi\u00e8re en BFUP sur place \u00e0 Z\u00fcrich"},"content":{"rendered":"<p>Le <a href=\"https:\/\/www.luechingermeyer.ch\/project\/ruby-zuerich-umnutzung-geschaeftshaus-du-pont\/\">changement d\u2019affectation du b\u00e2timent de bureaux nomm\u00e9 Du Pont<\/a>, au centre de Z\u00fcrich, est l&#8217;un des projets de maintenance les plus complexes actuellement entrepris par notre \u00e9quipe d&#8217;ing\u00e9nieurs. Une mesure essentielle est la modernisation des planchers en b\u00e9ton arm\u00e9 nervur\u00e9s qui sont class\u00e9 au patrimoine mat\u00e9riel. Ces \u00e9l\u00e9ments tr\u00e8s \u00e9lanc\u00e9s, compos\u00e9s de barres d\u2019armature non nervur\u00e9es et sans \u00e9triers, ne r\u00e9pondent plus aux exigences actuelles en mati\u00e8re de s\u00e9curit\u00e9 structurelle et de r\u00e9sistance au feu. En raison de l&#8217;\u00e9tendue des structures concern\u00e9es &#8211; les syst\u00e8mes de plafonds recouvrent une surface totale de 4\u2019300 m2, 1 200 nervures ont \u00e9t\u00e9 compt\u00e9es &#8211; le renforcement individuel s&#8217;est av\u00e9r\u00e9 disproportionn\u00e9. Au lieu de cela, la nouvelle m\u00e9thode de renforcement utilisant un b\u00e9ton fibreux ultra performant a \u00e9t\u00e9 utilis\u00e9e. Un recouvrement de BFUP de 40 mm d&#8217;\u00e9paisseur dans les zones critiques est suffisant pour r\u00e9pondre aux exigences de la norme actuelle.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le changement d\u2019affectation du b\u00e2timent de bureaux nomm\u00e9 Du Pont, au centre de Z\u00fcrich, est l&#8217;un des projets de maintenance les plus complexes actuellement entrepris par notre \u00e9quipe d&#8217;ing\u00e9nieurs. Une mesure essentielle est la modernisation des planchers en b\u00e9ton arm\u00e9 nervur\u00e9s qui sont class\u00e9 au patrimoine mat\u00e9riel. Ces \u00e9l\u00e9ments tr\u00e8s \u00e9lanc\u00e9s, compos\u00e9s de barres d\u2019armature [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":13779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-13918","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-non-classifiee"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts\/13918","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/comments?post=13918"}],"version-history":[{"count":5,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts\/13918\/revisions"}],"predecessor-version":[{"id":13924,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts\/13918\/revisions\/13924"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/media\/13779"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/media?parent=13918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/categories?post=13918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/tags?post=13918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}