{"id":34121,"date":"2023-06-29T10:36:33","date_gmt":"2023-06-29T08:36:33","guid":{"rendered":"https:\/\/www.luechingermeyer.ch\/tilia-tower-zu-besuch-in-oslo\/"},"modified":"2024-07-08T17:55:33","modified_gmt":"2024-07-08T15:55:33","slug":"tilia-tower-zu-besuch-in-oslo","status":"publish","type":"post","link":"https:\/\/lmp-ing.ch\/fr\/tilia-tower-zu-besuch-in-oslo\/","title":{"rendered":"Tilia Tower\u00a9 en visite \u00e0 Oslo"},"content":{"rendered":"<p><a href=\"https:\/\/www.fib-international.org\/\">fib \u2013 La F\u00e9d\u00e9ration Internationale du B\u00e9ton<\/a> (International Federation for Structural Concrete) a reconnu l&#8217;importance du projet de conception comme base essentielle pour relever les d\u00e9fis futurs. C&#8217;est pourquoi la f\u00e9d\u00e9ration a invit\u00e9 les experts au <a href=\"https:\/\/www.tekna.no\/en\/past-events\/43000\/fib-international-symposium-on-conceptual-design-of--structures-oslo-2023-43771\/\">Symposium International fib sur la conception des structures<\/a> \u00e0 Oslo. Du 29 juin au 1er juillet, des professionnels de la recherche et de la pratique \u00e9changeront sur les th\u00e8mes cl\u00e9s de l&#8217;innovation, de la durabilit\u00e9 et de l&#8217;\u00e9conomie circulaire. Le Dr Patrick Valeri de L\u00fcchinger+Meyer a r\u00e9pondu \u00e0 l&#8217;invitation. Il pr\u00e9sentera, le vendredi apr\u00e8s-midi, lors de la session technique 7 : Structures Durables, un expos\u00e9 intitul\u00e9 &#8220;Int\u00e9gration de nouvelles structures de grande hauteur avec des b\u00e2timents existants&#8221; en prenant l&#8217;exemple des plans de la tour Tilia\u00a9.<br \/>\nLa <a href=\"https:\/\/www.luechingermeyer.ch\/fr\/project\/tilia-tower-prilly-malley-2\/\">tour Tilia\u00a9<\/a> \u00e0 l&#8217;est de Lausanne est un projet de tour de 90 m\u00e8tres de hauteur, l&#8217;un des plus hauts b\u00e2timents de la Suisse Romande. Compar\u00e9e aux constructions conventionnelles en b\u00e9ton arm\u00e9, sa structure hybride vise \u00e0 r\u00e9duire consid\u00e9rablement les \u00e9missions de CO2. Dans le cadre du m\u00eame projet, les deux b\u00e2timents en b\u00e9ton existants \u00e0 c\u00f4t\u00e9 de la tour seront enti\u00e8rement r\u00e9nov\u00e9s et agrandis. Le point culminant des travaux de r\u00e9novation est une grande ouverture dans la fa\u00e7ade d&#8217;un centre sportif existant, qui servira \u00e0 connecter ce dernier \u00e0 la tour. Dans ce cadre \u2013 en plus de nombreuses autres mesures de renforcement \u2013 un mur en b\u00e9ton pr\u00e9fabriqu\u00e9 existant (avec c\u00e2bles de pr\u00e9contrainte int\u00e9gr\u00e9s) devra \u00eatre coup\u00e9.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>fib \u2013 La F\u00e9d\u00e9ration Internationale du B\u00e9ton (International Federation for Structural Concrete) a reconnu l&#8217;importance du projet de conception comme base essentielle pour relever les d\u00e9fis futurs. C&#8217;est pourquoi la f\u00e9d\u00e9ration a invit\u00e9 les experts au Symposium International fib sur la conception des structures \u00e0 Oslo. Du 29 juin au 1er juillet, des professionnels de [&hellip;]<\/p>\n","protected":false},"author":101013,"featured_media":27735,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-34121","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-non-classifiee"],"acf":[],"_links":{"self":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts\/34121","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/users\/101013"}],"replies":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/comments?post=34121"}],"version-history":[{"count":2,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts\/34121\/revisions"}],"predecessor-version":[{"id":34123,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/posts\/34121\/revisions\/34123"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/media\/27735"}],"wp:attachment":[{"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/media?parent=34121"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/categories?post=34121"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lmp-ing.ch\/fr\/wp-json\/wp\/v2\/tags?post=34121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}